Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision |
courses:cs397:winter2017:buzzword_bingo [2017/05/05 16:12] – [Monitoring] admin | courses:cs397:winter2017:buzzword_bingo [2017/05/05 16:13] – [Triage] admin |
---|
| |
===== Triage ===== | ===== Triage ===== |
Triage is the act of analyzing, understanding, and categorizing a specific set of defects, in preparation for making a repair scheduling decision. For a given set of defects, you need to determine how to act on them and proceed with repairs. The more serious defects, those with the highest priorities, receive action first, usually because of their import or because they are blocking further project activity. Source: http://www.informit.com/articles/article.aspx?p=2123715&seqNum=3 | Triage is the act of analyzing, understanding, and categorizing a specific set of defects, in preparation for making a repair scheduling decision. For a given set of defects, you need to determine how to act on them and proceed with repairs. The more serious defects, those with the highest priorities, receive action first, usually because of their import or because they are blocking further project activity. |
| |
| Source: http://www.informit.com/articles/article.aspx?p=2123715&seqNum=3 |
| |
=====Monitoring===== | =====Monitoring===== |